Renovation of the Maternity Ward in Hospital de Barcelona

Barcelona
Foto © Marc Ubach
Foto © Marc Ubach
Foto © Marc Ubach
Foto © Marc Ubach
Foto © Marc Ubach
Architetti
PINEARQ
Sede
Avda. Diagonal, 660, 08034 Barcelona
Anno
2017
Team
Alberto de Pineda, Marc Gomà, Ariadna Pérez, Jenicá Craiu, Alexandra Demetriu

This is a project of renovation of equipment and refurbish of internal spaces on the sixth floor of Hospital de Barcelona. The hospital building, dating from 1987, needed total renovation, therefore the work was done in phases so as not to interrupt the activities.

The maternity service is transferred to this floor, reduced from 30 to 27 individual rooms with bathroom, with the nursing area renovated and the waiting room extended. The layout of rooms was changed; materials, equipment and furniture were renewed; exterior carpentry was replaced to improve heating and sound characteristics.

Progetti collegati

  • Shanghai Suhe MixC World
    KOKAISTUDIOS
  • Welcome to the Stage!
    Kjellander Sjöberg
  • Hovering Kan-Too – Great Bay Area Center Showroom
    Wutopia Lab
  • Stockwell-Rodríguez Residence
    Belmont Freeman Architects
  • Haunsbergstraße | 1. Preis
    Architektinnen Schremmer.Jell ZT GmbH

Rivista

Altri progetti di PINEARQ

Extension of Bellvitge University Hospital - Phase I
L'Hospitalet de Llobregat
Anti-Doping Laboratory in Doha
Doha, Qatar
QuirónSalud Madrid University Hospital
Pozuelo de Alarcón
Santa Caterina Hospital in Martí i Julià Hospital Park
Salt
Hedwigshöhe Hospital
Berlin, Germania